The data needed before performing the calculation is:
-The average demand per time period.
-The standard deviation of demand per time period
-The assumption that demand is normally distributed
The data needed before performing the calculation is:
-The average demand per time period.
-The standard deviation of demand per time period
-The assumption that demand is normally distributed