A Workbench is a method of documenting how a particular activity must be fulfilled. A workbench is referred to a stages, steps, and assignments.
There are five assignments for each workbench:
- Input : Each task requires certain input and output parameters. For each workbench we need specific inputs. Input form is the first stage of the workbench.
- Perform: The main goal of the workbench is to change the input forms on the expected output ones.
- Check: Check ensures that output after the performing achieves the desired result.
- Production output: If the check is done correctly the production output becomes the last stage of the workbench.
- Rework: If the result after the check doesn’t meet our expectations we need to start again from the step of performance.